Environment
Waste Water Service
The wastewater of our participants which have been built in our region is purified with I. Part Treatment plant which has been put into operation in 1994 and II. Part of wastewater treatment plant which has been put into operation in 2008. The wastewater is purified according to discharge criteria which are given in Table 19 of Water Pollution Control Regulation. The plants have 80.000 m³/day wastewater treatment capacity totally; the I. Part has 40.000 m³ / day and II. Part has 40.000m ³ / day capacity. 190 firms wastewater is treated in plants.
Çerkezköy Organized Industrial Zone wastewater treatment plants consist of the following units:
Physical Purification
– Coarse and Fine Grids
– Sand and Grease Trap Tanks
– Balancing Tanks
– Pumping Tanks
Chemical Treatment
– Fast and Slow Mixer
– Chemical Precipitation Tanks
Biological Treatment
– Bio Phosphorus Tanks
– Aeration Tanks
– Final Settling Tank
Sludge Dewatering
– Çamur Havuzları,
– Dekantörler
Çamur Bertaraf
– Sludge Thickening Tanks
– Sludge Holding Tanks
– Decanters
The wastewater of our participants which have been built in our region should match with Çerkezköy Organized Industrial Zone Wastewater Discharge Criteria.
Click for Çerkezköy Organized Industrial Zone I Part Firms Wastewater Discharge Criteria
Click for Çerkezköy Organized Industrial Zone II Part Firms Wastewater Discharge Criteria
Our industrialists operating in our region obtain Channel Connection Permit from our zone, if they match with Çerkezköy Organized Industrial Zone Wastewater Discharge Criteria.